Automotive Hardware Insertion Tooling

One of our Tier 2 automotive supply customers came to us with a part they wanted to run in their stamping department. For this high-volume project to be profitable for them, they felt they needed to insert hardware into the progressive stamping die to produce a complete part, reducing their labor requirement.

Our design team worked with them to model a concept and find the insertion unit that would work best for their application. In 12 weeks, WMPI built this tool and had it debugged, set up on our full feed line and running at the targeted run rate in our 200-ton press.


Project Details

Product Description   Automotive Air Bag Tooling
Capabilities Applied/Processes  
Primary:
Progressive tool building
Secondary:
Insertion tooling
Hard milling
Equipment Used to Manufacture Part  
Solidworks, WEDM, Jig grinding, CNC form grinding, CNC machines
Overall Part Dimensions  
Length: 24”
Width: 60”
Tightest Tolerances  
±.0005”
Material Used   A-2, D-2, M-2, CPM, 4140, Carbon Steel
Max Material Finsih   125Ra
In Process Testing/Inspection Performed   First Article, CMM, Inspection Gage 500 piece runoff
Lead Time   14 weeks
Industry for Use   Automotive
Volume   Tooling designed to run 1,000,000 hits
Delivery Location   Western, USA
Standards Met   Customer supplied print, 2D CAD Drawing, customer die standards, First Article approval, Runoff
Product Name   Progressive die with in-die insertion unit