Skip Navigation
Past Projects

Military Ordnance – Mechanical Fuze

This manufacturer originally consulted Wisconsin Metal Parts because its current stamping supplier struggled to maintain the tooling and produce tightly toleranced parts. On several occasions, we performed maintenance and repairs on the tooling and ran good parts at production rate in our stamping department.

After several more attempts to work with its current supplier, the customer finally moved its entire stamping operation to WMP. We were able to run all of their parts successfully for many years and we have designed, built, qualified and now run new tooling as their original tooling wore out. We have also designed and built gages to ensure nonconforming parts do not leave our building. This relationship has succeeded since 1999, and we have produced nearly 320 million parts for this customer. References are available on this project.

Details And Specifications
Product Description
Military Ordnance - Mechanical Fuze
Capabilities Applied/Processes
Primary: Production Stamping
Equipment Used to Manufacture Part
30-ton Bruderer presses
100-ton Minster presses
Material Used
1100-0, 6061-T0, 7075-T0, 7075-T6
Phos Bronze, 80/20 Commercial Bronze
HSLAS 1095
Stainless, 17-7PH
Be Copper
Kovar
In Process Testing/Inspection Performed
First Article
PPAP
Gage MSA
Cpk
In-process gages
Smart Scope Vision System
CMM
Optical Comparator
Force Testing
Destructive testing
Deflection Testing
Industry for Use
Military
Volume
20,000,000 EAU
Delivery Location
Illinois
Standards Met
Customer supplied print, 2D CAD Drawing,
GD&T
MIL specifications
Material & process certifications
ASME Y14.5M-1994
MIL-C-5541
SAE-AMS-H-7199
SAE-AMS-2770
SAE-AMS-2759
MIL-A-2550
MIL-STD-171
MIL-DTL-32175
QQ-C-533
AMS-5121
ASTM-A684
Do You Have An Idea For A Project?
We are capable and open to any size project. Contact us to schedule a meeting or to get a free quote.
Request A Quote
Let Us Help You With Your Project