This manufacturer originally consulted Wisconsin Metal Parts because its current stamping supplier struggled to maintain the tooling and produce tightly toleranced parts. On several occasions, we performed maintenance and repairs on the tooling and ran good parts at production rate in our stamping department.
After several more attempts to work with its current supplier, the customer finally moved its entire stamping operation to WMP. We were able to run all of their parts successfully for many years and we have designed, built, qualified and now run new tooling as their original tooling wore out. We have also designed and built gages to ensure nonconforming parts do not leave our building. This relationship has succeeded since 1999, and we have produced nearly 320 million parts for this customer. References are available on this project.
100-ton Minster presses
Phos Bronze, 80/20 Commercial Bronze
HSLAS 1095
Stainless, 17-7PH
Be Copper
Kovar
PPAP
Gage MSA
Cpk
In-process gages
Smart Scope Vision System
CMM
Optical Comparator
Force Testing
Destructive testing
Deflection Testing
GD&T
MIL specifications
Material & process certifications
ASME Y14.5M-1994
MIL-C-5541
SAE-AMS-H-7199
SAE-AMS-2770
SAE-AMS-2759
MIL-A-2550
MIL-STD-171
MIL-DTL-32175
QQ-C-533
AMS-5121
ASTM-A684