One of our Tier 2 automotive supply customers came to us with a part they wanted to run in their stamping department. For this high-volume project to be profitable for them, they felt they needed to insert hardware into the progressive stamping die to produce a complete part, reducing their labor requirement.
Our design team worked with their engineering staff to model a concept and find the insertion unit that would work best for their application. In 12 weeks, Wisconsin Metal Parts built this tool and had it debugged, set up on our full feed line, and running at the targeted run rate in our 200-ton press. In the end, this insertion reduced the part cost by $.42 and we delivered tooling to another happy customer.
Details And Specifications
Product Description
Automotive Air Bag Tooling
Capabilities Applied/Processes
Primary:
Progressive tool building
Secondary:
Insertion tooling
Hard milling
Progressive tool building
Secondary:
Insertion tooling
Hard milling
Overall Part Dimensions
Length: 24”
Width: 60”
Width: 60”
Tightest Tolerances
±.0005”
Material Used
A-2, D-2, M-2, CPM, 4140, Carbon Steel
Max Material Finish
125Ra
In Process Testing/Inspection Performed
First Article, CMM, Inspection Gage, 500 piece runoff
Lead Time
14 Weeks
Industry for Use
Automotive
Volume
Tooling designed to run 1,000,000 hits
Delivery Location
Western USA
Standards Met
Customer supplied print
2D CAD Drawing
Customer die standards
First Article approval
Runoff
2D CAD Drawing
Customer die standards
First Article approval
Runoff
Product Name
Progressive die with in-die insertion unit
Do You Have An Idea For A Project?
We are capable and open to any size project. Contact us to schedule a meeting or to get a free quote.
Request A Quote